Demolition Process in an Interior Demolition

Did you ever wonder how any interior demolition is being done?
Just imagine everything inside a property, and that includes all electrical, mechanical and plumbing fixtures and elements being removed in a matter of hours.

The mayor difference between an entire building demolition and an interior demolition is the process and time involved in it. For an entire building demolition heavy equipment and speed is required. Generally a bulldozer, a front loader and dump trucks will do the job very efficiently.

On the other hand an interior remodeling will require a more careful and slower process. Only hand power tools will be involved in the process and special attention to all elements to remain in place will be essential.

A partial interior demolition job is even slower than any other demolition job. Manpower, skills, organization and special care of all remaining elements is crucial to a successful interior demolition job.

The posted pictures are some examples of interior demolition being done on some of our projects.

IMG_20130607_140512

IMG_20130607_150153



Leave a Reply

Please type the characters of this captcha image in the input box

Please type the characters of this captcha image in the input box